Flex gets blamed for a lot of airflow problems, and some of that is fair. A lot of the time, though, it isn't the duct so much as how it got hung. Sag is the part everybody notices, so it's worth knowing how much is actually OK and what a saggy run might be hiding.

A slack run in the attic. The sag is the part you can see.

How much sag is OK?

The numbers below aren't mine. They come from the Air Duct Council (ADC) Flexible Duct Performance & Installation Standards, which is the one most manufacturers' instructions follow, and they're pretty simple:

  • Straps no more than 4 feet apart (6 feet on vertical runs). A connection to a collar or a boot counts as a support.
  • Straps at least 1½ inches wide where they touch the duct.
  • No more than ½ inch of sag per foot of spacing between supports. With straps at 4 feet, that's 2 inches at the most.

The manufacturer's instructions for the duct you're using are worth a look, too; some may be stricter.

Straps 4 feet apart, 1½ inches wide, and no more than 2 inches of sag between them.

So a couple of inches is fine. When a run hangs well past that between straps, it's outside the standard, and it's worth checking whether the duct was ever pulled out to its full length before it was cut.

What the sag can be hiding

Inside the jacket and insulation, flex is a thin plastic liner wrapped around a wire coil. When the duct is pulled out all the way, that liner is close to smooth between the wires. When it isn't, the extra liner has to go somewhere, and it bunches up into folds that stick out into the airstream. From the outside, all you can see is a jacket that's a little wrinkly and a run that hangs lower than it should.

Two pieces of the same duct, cut open. Pulled tight (top), the liner is close to smooth. Compressed 30% (bottom), it bunches up into folds.

“Compressed” just means the run is shorter than the duct's full stretched length. Put 25 feet of duct in a run that only needs about 21 feet, and it's around 15% compressed.

The same 30 inches of duct at 0%, 15%, and 30% compression.

From what's been tested on this, flex that’s pulled all the way out has about the same resistance to airflow as metal duct. Once the flex is compressed, the resistance climbs a lot faster than you'd guess from the outside, which is why the standard makes such a point of pulling it tight. In a real system, the air doesn't push through that extra resistance; it takes the easier path through the other runs, so the compressed run ends up with less air at its register. A blower that holds its total airflow just sends more of it down the other runs.

Laid across the chords

Flex laid across the bottom chords with no straps. It sags between the chords, and if nobody pulled it tight, it's compressed the whole way.

Laying flex across the joists or bottom chords is allowed, as long as it's pulled tight. When it isn't, it sags a little in every bay, and it's compressed the whole way. It might not look like much from the attic hatch, but that combination is a rough one for airflow.

Straps that pinch

A ¾-in strap cinched up tight (left) squeezes the duct. A 1½-in strap (right) holds it without choking it.

That 1½-inch minimum is there for a reason. A narrow strap, a piece of wire, or a plumber's strap pulled tight can squeeze the duct down where it hangs, and if it's tight enough, it can pinch the liner, too. Squashed insulation is also a spot where a duct can sweat. If the straps you've got are narrow, a sheet-metal saddle under the duct spreads the load out.

Bends at the boot

A hard turn right over the boot collar can kink the duct (left). Give it a sweep and a strap before the bend (right); the boot collar counts as the support after it.

Bends work the same way. The standard calls for a bend radius of at least one duct diameter (for a 6-inch duct, nothing tighter than about a 6-inch radius), with a support before and after a sharp bend. A run that comes in flat and turns down hard right over the boot collar can kink on the inside of the turn, and that can be a restriction right at the register.

Hanging it right

The same run, pulled tight, cut to length, and strapped at 4 feet.

None of this is complicated:

  • Pull the duct out to its full length before you cut it, then cut off the extra. Bryan's Flex Ducts – Best Practices has a good tip on stretching it out first.
  • Strap it every 4 feet or less with a strap at least 1½ inches wide, and don't cinch the strap down into the duct.
  • Keep the sag inside the standard: ½ inch per foot of strap spacing.
  • Give the bends some room, and support the duct before and after them.

Some sag is allowed. A lot of sag can mean slack, and slack can cost you airflow at the register.

–JD Kelly

Work through this with the trade.

Highlight a short passage, or bring a question about a specific moment into HVAC No Bull Forum.

Discuss this reference → Related forum discussions

Comments

To continue you need to agree to our terms.

The HVAC School site, podcast, and tech tips are
made possible by generous support from